Commercial Quote
Wegmans #84 McKinley Parkway Image by Wm. T. Spaeder
Plumbing

Project Summary

Domestic Hot Water Generation System Replacement and Tempered Water System Delivery Revisions

Project Scope

  • Replace 140* hot water tank heaters with high efficiency water boilers with storage tanks to provide larger capacity and redundancy while operating at higher efficiency
  • Modify tempered water delivery system from interconnected loops to one continuous loop for consistent delivery temperatures