fbpx

National Fuel

Category: HVAC, Industrial | Refining | Power Location: Erie, PA

Project Summary

Chiller and associated cooling system equipment replacement located on the roof and penthouse floor.


Project Scope

  • Remove and replace multistack chiller
  • Remove and replace BAC cooling tower
  • Remove and replace sump tank
  • Remove and replace heat exchanger
  • Remove and replace control valves and upgrade control system