- Complete mechanical and plumbing
- Full BIM – WTS lead
- 2-1/2 year duration
- 23 AHU/MAU/DOAS units
- Chilled water system
- 3 chillers
- HHW system
- 3 boilers
- 450+ VAVs
- CRAC unit system
- 3 dry coolers
- 24 terminal units
- Snow melt and radiant heat
- 23 Pumps
- 200 Drains
- 150 Plumbing Fixtures