fbpx

Projects

 

Commercial HVAC Remodel for Educational Facility in Warren, Pa

Category: Education | Office | Retail, HVAC
Location: Warren, PA

A commercial HVAC remodel and new construction in Warren, Pa. of the 150,000 square-foot Beaty Warren Middle School.

Cranberry Township Acoustic Silencers

Category: Water | Waste Water Treatment
Location: Cranberry, PA

Replace five existing underperforming acoustic silencers.

Crawford County Courthouse New Facility

Category: Education | Office | Retail, Plumbing
Location: Meadville, PA

Construction of a 4 story, 60,000 SF, brand new judicial center for Crawford County.

Crawford County Courthouse Renovation | Fire Protection

Category: Education | Office | Retail, Fire Protection
Location: Meadville, PA

Construction of a brand new three-story, 60,000 square-foot Crawford County judicial center.

Donjon Dry Dock

Category: Fabrication, Industrial | Refining | Power, Process Piping
Location: Erie, PA

For this project, Spaeder replaced the 20” and 48” discharge piping on four pumps in the dry dock. All of the piping was fabricated in the Erie, PA fab shop.

The dry dock is used to build, repair, convert, dry dock, and repower ships. It is one of only two dry docks on the Great Lakes capable of docking 1,000 foot vessels.

e2comply

Category: Fabrication, Industrial | Refining | Power
Location: Various Locations

Partnership with e2comply to provide travelling mechanical installation of exhaust stacks and air quality emissions control equipment on emergency backup generators at hospitals, datacenters, and other power critical facilities.