At the Donjon Dry Dock in Erie, PA, we replaced the 20” and 48” discharge piping on four pumps as well as four valves. All of the piping was fabricated in the fab shop of the Wm. T. Spaeder Company.
In late 2018, Wm.T. Spaeder was contracted by a water treatment design firm to design and fabricate thirteen (13) unique equipment skids for a large power plant in Georgia. This power plant was in the process of decommissioning their settling ponds and replacing them with a new wastewater treatment system to treat flue gas desulfurization (FGD) waste as mandated by new EPA regulations and these skids will become part of that complex treatment process.